Search Results

Cycle path network extended

By admin9bKp8, 8 May, 2026

Council crews are clearing the way for more than two kilometres of new path along Elizabeth Mitchell Drive. The 2.5-metre-wide path will connect to existing sections of track along Elizabeth Mitchell Drive and then continue along Corrys Road.

The project involves the following works:

  • Clearing of trees and shrubs,
  • A 2.5 metre wide asphalt footpath along the eastern side of Elizabeth Mitchell Drive,
  • Pedestrian crossings across Quandong Road, Elizabeth Mitchell Drive and Corrys Road,
  • A 2.5metre wide asphalt footpath along Corrys Road, and
  • Replanting of trees and shrubs.

The tree removal is required to allow the construction of the footpath but an extensive planting program along the length of the new path will replace the removed trees with native trees and shrubs to provide habitat and visual appeal.

The works are expected to take between eight and 12 weeks to complete.

We appreciate your co-operation while this project is delivered to our community.

Promoted to council news list
Off
Date
26 May 2021
Image Set
Photos
Image
Cycle path network extended
Display Style
Carousel
Hidden
Hide
Carousel Image Resize Options
Auto
Title Tag
H2
Placement
Main Content
Click Behaviour
Lightbox
Page Properties
Summary
Albury’s cycle path network continues to grow, with work now under way on a section of track in Thurgoona.
Auto Generate
Smart
Auto Generated Position
End of Page Content
Header Image Style
Auto (Levels 1, 2 and 3 Only)
Generate Breadcrumbs
Auto (All except landing pages)
Content Alignment
Auto
Appearance
Full
Header Summary Style
Auto
Enable Share Button
Auto
Auto Generation Images
Show Images
Enable Two Columns
Off
Header Image Size
Default